Pipeline pump installation method

May 13, 2025 Leave a message

1. The radial runout of the equipment shaft should be ≤0.04 mm, and the axial runout is not allowed to be greater than 0.1 mm;
2. The sealing parts of the equipment should be kept clean during installation, the sealing parts should be cleaned, and the sealing end faces should be intact to prevent impurities and dust from entering the sealing parts;
3. It is strictly forbidden to hit or knock during the installation process to avoid the mechanical seal friction damage and seal failure;
4. During installation, a layer of clean mechanical oil should be applied to the surface in contact with the seal to ensure smooth installation;
5. When installing the static ring gland, the tightening screws must be evenly forceful to ensure the vertical requirements of the static ring end face and the axis centerline;
6. After installation, push the moving ring by hand to make the moving ring move flexibly on the shaft and have a certain elasticity;
7. After installation, turn the rotating shaft by hand, and the rotating shaft should not feel light or heavy;
8. The equipment must be filled with medium before operation to prevent dry friction from causing seal failure;